In short
A house not connected to the mains sewer must have its own assainissement non collectif (off-mains drainage) system (all-waste septic tank, micro treatment plant, etc.), maintained by the owner and inspected by the SPANC, the service public d’assainissement non collectif (public off-mains drainage service), at least every 10 years. On a sale, the inspection report must be less than 3 years old when the deed is signed (Code de la santé publique (Public Health Code), art. L1331-11-1) and be included in the dossier de diagnostic technique (pack of mandatory surveys). If the system does not comply, the buyer must carry out the works within one year of the deed of sale (Code de la construction et de l’habitation (Building and Housing Code), art. L271-4).
Who is affected, and who inspects
Any building that cannot be connected to the public sewer network must be fitted with an individual system, for example an all-waste septic tank or a micro treatment plant; this is the case in an off-mains drainage zone or for a building exempted from connection (service-public.gouv.fr, fiche F447). The owner must ensure its regular maintenance and periodic emptying by an approved person (CSP, art. L1331-1-1).
Each commune (municipality) or grouping of municipalities has a SPANC. Its inspection duties are compulsory (service-public.gouv.fr):
- examining the design of new systems or systems to be renovated;
- checking that the works have been properly carried out, before backfilling;
- inspecting the operation and maintenance of existing systems, at a frequency set by the commune in its service regulations, 10 years at most.
The inspection is compulsory and charged for; the user cannot choose another provider. The SPANC sends a notice of visit at least 7 working days beforehand, and its officers have a right of access to the property (service-public.gouv.fr).
Maintenance and emptying
Maintenance mainly consists of emptying the tank and the grease trap, by the commune if it offers this service or by a firm approved by the préfet (State representative in the département). The frequency depends on the sludge level, which should generally not exceed 50% of the working volume (service-public.gouv.fr). Keep the emptying receipts: the SPANC checks maintenance.
The redevance d’assainissement non collectif (off-mains drainage charge), often billed with the water, includes an element for the inspection, billed to the owner, and possibly an element for maintenance if this service is used. If unpaid 3 months after a formal notice, it is increased by 25% (service-public.gouv.fr).
Unfavourable inspection outside a sale
The owner carries out the works required by the inspection report within 4 years of being notified of it (CSP, art. L1331-1-1). Service-public.gouv.fr specifies that this period concerns systems posing a danger to health or a proven risk of pollution.
If the inspection is refused or obligations are not met, the commune can claim a sum at least equal to the charge, increased by up to 400% (CSP, art. L1331-8), and, after formal notice, have the essential works carried out automatically at the owner’s expense (art. L1331-6).
If a mains sewer reaches the street, connection becomes compulsory within 2 years of it coming into service (CSP, art. L1331-1).
On a sale: the report under 3 years old
The document drawn up after the SPANC inspection is part of the dossier de diagnostic technique (CCH, art. L271-4, 8°). This pack is provided by the seller and attached to the promesse de vente (preliminary sale contract) or, failing that, to the acte authentique (final deed). The report must be less than 3 years old when the deed is signed; if it is older or does not exist, updating it is the seller’s responsibility (CSP, art. L1331-11-1). The seller makes an appointment with the SPANC, whose contact details are available at the mairie (town hall).
Without this document still valid at signature, the seller cannot exclude the garantie des vices cachés (warranty against hidden defects) for that matter (art. L271-4). The notaire (notary) then sends a certificate of sale to the commune no later than 1 month after signature. The full list of surveys is given in diagnostics obligatoires (mandatory surveys).
After the purchase: one year to bring it up to standard
Article L271-4 of the CCH is clear: “If the off-mains drainage system does not comply when the final deed of sale is signed, the buyer shall have the compliance works carried out within one year of the deed of sale.”
The seller can carry out the works before the sale; otherwise, their cost becomes part of the price negotiation (service-public.gouv.fr). The éco-prêt à taux zéro (zero-rate eco-loan) can, subject to conditions, finance these works.
Discrepancy to note. Fiche F31685 on service-public.gouv.fr (verified on 26 February 2025) states that the seller “must carry out works” in the year following the deed, with the buyer taking them on only if the seller declines, and that the report is handed over “at the time the final deed is signed”. The law in force places the obligation to carry out works on the buyer and requires the report to be attached from the preliminary contract (CCH, art. L271-4); this guide follows the law. Fiche F447 on the same site does refer to it being attached to the preliminary contract.
FAQ
How long is the off-mains drainage report valid?
It must be less than 3 years old when the deed of sale is signed (CSP, art. L1331-11-1).
Who carries out the septic tank inspection?
The commune’s SPANC, not a private surveyor; its report serves as the survey (service-public.gouv.fr).
I am buying a house with a non-compliant septic tank: how long do I have for the works?
One year after the deed of sale (CCH, art. L271-4). Have the works costed before signing: they are negotiated on the price.
How often does the SPANC come?
According to your commune’s regulations, at least every 10 years (service-public.gouv.fr).
What should I plan for on a building plot without mains drainage?
You will need an individual system: the planning permission application must then include a certificate of compliance of the project issued by the SPANC, and the commune can require a soil survey (service-public.gouv.fr). See acheter un terrain (buying a plot of land) and permis de construire (planning permission).
Which professional to consult
The notaire (notary) checks that the SPANC report is less than 3 years old, attaches it to the preliminary contract and reminds the buyer of their obligation to carry out works within the year. The other surveys in the pack, such as asbestos or electrics, are a matter for a diagnostiqueur (property surveyor). The agent immobilier (estate agent) selling a house with individual drainage can request the report as soon as it goes on the market, to avoid delaying the preliminary contract.
Find a professional
One professional per trade and per area, selected and scored out of 100 from public data, with a verifiable title. The trade, its official register and the professionals selected (pages in French):
The notary selected in the largest cities
| City | Professional | Area | Score /100 | Status |
|---|---|---|---|---|
| Paris | Dextera Notaires | Paris, 7e arrondissement | 91 | Selected |
| Marseille | 1391 Notaires | Marseille, 8e arrondissement | 85 | Selected |
| Lyon | Archers Notaires | Lyon, 2e arrondissement | 92 | Selected |
| Montpellier | Lexnot | Montpellier | 93 | Selected |
| Bordeaux | 1645 Notaires | Bordeaux | 90 | Selected |
| Lille | Notaires Lille Royale | Lille | 70 | Selected |
| Rennes | Notaires des Lices | Rennes | 87 | Selected |
| Dijon | Legatis Dijon-Genlis | Dijon | 86 | Selected |
| Brest | Quid Novi Brest Notaires & Conseils | Brest | 86 | Selected |
| Cannes | 1795 | Cannes | 70 | Selected |
The 10 cities with the most sales (DVF 2025) where a notary is selected; in a city with several areas, the best-scoring profile. "Verified": title read at the register by Payotte; "Selected": title declared, verifiable on the profile.
Related guides
Sources
- Assainissement des eaux usées domestiques (service-public.gouv.fr, vérifié le 12 décembre 2025) (checked 12 October 2026)
- Diagnostic immobilier : assainissement des eaux usées (assainissement collectif et non collectif) (service-public.gouv.fr, vérifié le 26 février 2025) (checked 12 October 2026)
- Code de la santé publique, articles L1331-1 à L1331-31, dont L1331-1-1, L1331-8 et L1331-11-1 (version en vigueur depuis le 25 août 2021) (Légifrance, lien relevé sur les fiches F447 et F31685) (checked 12 October 2026)
- Code de la construction et de l'habitation, article L271-4 – version en vigueur depuis le 11 avril 2024 (Légifrance, lien relevé sur la fiche F31685) (checked 12 October 2026)
- Code général des collectivités territoriales, article L2224-8 : mission de contrôle de la commune (Légifrance, lien relevé sur la fiche F31685) (checked 12 October 2026)
- Arrêté du 27 avril 2012 relatif aux modalités de l'exécution de la mission de contrôle des installations d'assainissement non collectif (Légifrance, lien relevé sur la fiche F31685) (checked 12 October 2026)