In short
The contrat de construction de maison individuelle (CCMI, the statutory contract for building a detached house) is compulsory whenever a professional builds, to a plan it has proposed, a residential building comprising no more than two dwellings for the same maître d’ouvrage (the client commissioning the works) (CCH, the Construction and Housing Code, art. L231-1). The contract must contain 11 terms (a to k) set by article L231-2. Payments follow progress on site: 15% at most when work starts, then 25%, 40%, 60%, 75% and 95% once the fitting-out work is complete (CCH, art. R231-7). The dépôt de garantie (deposit) is limited to 3% of the price (art. L231-4). The builder provides a garantie de livraison (delivery guarantee) at the agreed price and timescale (art. L231-6), and you have 10 days to withdraw (service-public.gouv.fr).
When the CCMI is compulsory
Article L231-1 of the Code de la construction et de l’habitation (CCH, version in force since 1 July 2021) covers anyone who undertakes to build a building for residential use, or for mixed professional and residential use, “comprising no more than two dwellings intended for the same client, to a plan that they have proposed or had proposed”. That person is then “deemed to be the builder of the works”.
There are two variants (service-public.gouv.fr, sheet F34554, checked on 10 July 2026):
- the CCMI with supply of plans, the most common, governed by articles L231-1 to L231-13 and R231-1 to R231-14 of the CCH;
- the CCMI without supply of plans, where you bring your own plans, governed by articles L232-1 and L232-2 and R232-1 to R232-7.
The mandatory terms of the contract
Article L231-2 of the CCH lists what the contract must contain:
| Letter | Term |
|---|---|
| a | Description of the plot and title deed or right to build |
| b | Statement that the project complies with building regulations |
| c | Extent and technical specifications of the building |
| d | Cost of the building: fixed and final price, and cost of the work left for you to pay |
| e | Payment terms according to progress on site |
| f | Option of being assisted by a professional at handover |
| g | Obtaining the permis de construire (building permit) |
| h | Financing arrangements (type and amount of loans) |
| i | Start date of works, construction period and late-delivery penalties |
| j | Reference of the assurance dommages-ouvrage (building defects insurance) |
| k | Evidence of the refund and delivery guarantees |
Service-public.gouv.fr specifies that the late-delivery penalties in the contract are “at least 1/3,000 of the price per day”. This is the floor in article R231-14: they “may not be set at an amount lower than 1/3,000 of the agreed price per day of delay”. For a house costing €240,000, that comes to at least €80 a day.
Prohibited clauses. Article L231-3 deems unwritten, among others, clauses that make handing over the keys conditional on payment in full, prohibit you from visiting the site, or release the builder from its deadlines other than for bad weather, force majeure and unforeseeable events.
Capped stage payments
Article R231-7 (version in force since 1 January 2020) sets cumulative caps:
| Stage of works | Maximum total paid |
|---|---|
| Start of works | 15% of the price |
| Foundations complete | 25% |
| Walls complete | 40% |
| Watertight (roof on) | 60% |
| Partitions complete and weathertight | 75% |
| Fitting-out work complete | 95% |
| Handover (réception) | balance (5%) |
Before work starts. The deposit “may not exceed 3% of the price of the planned construction” (art. L231-4); it is held in a special account in your name (service-public.gouv.fr). Article R231-8 provides another option: a payment of no more than 5% of the price on signing, then another of 5% at most when the building permit is issued.
The balance at handover. If you are assisted by a professional, the balance is paid when the snags are cleared or, if there are none, at the end of the handover. Without assistance, it is due within eight days of the keys being handed over, or when the snags are cleared. If there are réserves (snags recorded at handover), a sum “at most equal to 5% of the agreed price” is deposited with an escrow holder accepted by both parties or, failing that, appointed by the president of the tribunal judiciaire (civil court) (art. R231-7, II).
The delivery guarantee, the heart of the CCMI
The delivery guarantee is a “joint and several guarantee given by an approved credit institution, financing company or insurance company” (CCH, art. L231-6, version in force since 1 February 2020). It covers:
- the cost of price overruns needed to complete the works, with a possible excess “not exceeding 5% of the agreed price”;
- the consequences of the builder’s actions that have led to an early payment or a price supplement;
- the flat-rate penalties set in the contract where delivery is late by more than thirty days.
It runs from the start of works and ends at handover, or when the snags are cleared (service-public.gouv.fr, sheet F34253). If the builder defaults, you serve it formal notice by registered letter, then call on the guarantor. If the builder does not respond within 15 calendar days of the guarantor’s formal notice, the guarantor appoints whoever will finish the works.
There is also a garantie de remboursement (refund guarantee) for sums paid before work starts, evidence of which is one of the mandatory terms (art. L231-2, k).
Withdrawal and conditions precedent
You have 10 calendar days to withdraw by registered letter with acknowledgement of receipt sent to the builder. The period runs from the day after the letter notifying you of the contract is first presented (service-public.gouv.fr; CCH, art. L271-1 to L271-3).
The contract may be signed subject to conditions suspensives (conditions precedent): purchase of the plot, building permit, loans, building defects insurance, delivery guarantee (art. L231-4). It must state the maximum period for these conditions to be met and the resulting start date of works.
If you keep part of the works for yourself, you have 4 months from signing to change your mind (service-public.gouv.fr).
FAQ
Can the builder ask me for 30% of the price when work starts?
No. The total paid cannot exceed 15% when work starts; 25% is only reached once the foundations are complete (CCH, art. R231-7).
What deposit can be required on signing?
3% of the price at most, in a special account in your name (art. L231-4). Alternative: 5% on signing, then 5% when the building permit is granted (art. R231-8).
What penalties apply if the house is delivered late?
Those in the contract, never less than 1/3,000 of the price per day (art. R231-14). Beyond thirty days’ delay, the delivery guarantee covers them if the builder does not pay (art. L231-6).
What happens if the builder goes bust during the works?
The delivery guarantor takes over. After its own formal notice has gone unanswered for 15 calendar days, it appoints whoever will complete the works (service-public.gouv.fr, sheet F34253).
Can I hold back money if I find defects at handover?
Yes. If you record snags, a sum of up to 5% of the price is held in escrow until they are cleared (art. R231-7). Without a professional at your side, you have 8 calendar days to report visible defects by registered letter (service-public.gouv.fr).
Which professional to consult
Before signing, the géomètre-expert (chartered surveyor) checks the description and boundaries of the plot, the first term of the contract. The courtier en crédit (mortgage broker) aligns loan drawdowns with the schedule in article R231-7 and with the condition precedent on obtaining loans. The notaire (notary) can coordinate the purchase of the plot with the condition precedent on its acquisition set out in the contract.
Find a professional
One professional per trade and per area, selected and scored out of 100 from public data, with a verifiable title. The trade, its official register and the professionals selected (pages in French):
The chartered surveyor (géomètre-expert) selected in the largest cities
| City | Professional | Area | Score /100 | Status |
|---|---|---|---|---|
| Paris | Actif Géo | Paris, 14e arrondissement | 77 | Selected |
| Marseille | ATGTSM | Marseille, 9e arrondissement | 73 | Selected |
| Lille | MA-GEO | Lille | 74 | Selected |
| Cannes | Pythagore Géomètres-Experts | Cannes | 70 | Selected |
| Nîmes | Relief GE | Nîmes | 72 | Selected |
| Perpignan | Geopole - Géomètres-Experts Associés | Perpignan | 72 | Selected |
| Nancy | Geodatis Selarl Geometres Experts | Nancy | 76 | Selected |
| Annecy | GEHOM | Annecy | 74 | Selected |
| Avignon | Géo-Experts | Avignon | 70 | Selected |
| Quimper | Cornouaille Ingénierie Topographie | Quimper | 70 | Selected |
The 10 cities with the most sales (DVF 2025) where a chartered surveyor (géomètre-expert) is selected; in a city with several areas, the best-scoring profile. "Verified": title read at the register by Payotte; "Selected": title declared, verifiable on the profile.
Related guides
Sources
- Construire sa maison : quel contrat passer avec un professionnel ? (service-public.gouv.fr, vérifié le 10 juillet 2026) (checked 11 October 2026)
- Garantie de livraison d'une maison individuelle (service-public.gouv.fr, vérifié le 12 décembre 2025) (checked 11 October 2026)
- Code de la construction et de l'habitation, articles L231-1 à L231-13 (Légifrance) (checked 11 October 2026)
- Code de la construction et de l'habitation, article L231-6 (Légifrance) (checked 11 October 2026)
- Code de la construction et de l'habitation, articles R231-1 à R231-14 (Légifrance) (checked 11 October 2026)
- Code de la construction et de l'habitation, articles L232-1 à L232-2 (Légifrance) (checked 11 October 2026)