In short
Flooding is the leading natural hazard in France: 17.1 million people are exposed to rivers overflowing and 1.4 million to coastal flooding (Ministry of Ecological Transition, page updated on 6 April 2023). Where a plan de prévention des risques d’inondation (PPRI, flood risk prevention plan) exists, it classifies land into unbuildable zones, zones buildable subject to conditions and buildable zones, and it overrides the PLU (local development plan) as a servitude d’utilité publique (public-interest easement). The seller must provide an état des risques (risk report) less than 6 months old from the first viewing. If a flood is recognised as a natural disaster by official order, insurance pays out with a statutory excess of €380 for a home (service-public.gouv.fr, checked on 10 April 2026). On land classified as unbuildable by a PPR (risk prevention plan), an insurer may refuse to cover a property built after the plan was published (code des assurances, the Insurance Code, art. L125-6).
What is a PPRI?
PPRI is the everyday name for the plan de prévention des risques naturels (PPRN, natural risk prevention plan) as applied to flooding. It is drawn up under the authority of the préfet (the State’s representative in the département), with the involvement of the communes (municipalities), and comprises three documents (Ministry of Ecological Transition):
- a presentation report justifying the zoning;
- a zoning map, produced by cross-referencing hazards and what is at stake, which distinguishes unbuildable zones, zones buildable subject to specific arrangements and buildable zones;
- a set of regulations laying down the building and planning constraints for each zone.
Once approved after a public inquiry, it is annexed to the plan local d’urbanisme (local development plan) as a public-interest easement, and “its provisions take precedence over any other consideration”. Its rules apply to future and existing buildings alike. It may require, for example, the height of the ground floor above the highest known water level, make certain areas unbuildable or require tanks to be anchored (Ministry of Ecological Transition, “Prévention des inondations” page).
For the hazards of rivers overflowing and coastal flooding, the rules for drawing up the plan are set by decree no. 2019-715 of 5 July 2019, codified in articles R562-11-1 et seq. of the code de l’environnement (Environment Code). The legislative framework is in articles L562-1 to L562-9 of the same code.
What the seller must tell you
The risk report is compulsory for a property located in a zone of an approved natural PPR, or in an area under study for a prescribed PPR (service-public.gouv.fr, checked on 28 September 2026). It applies to all properties, built or not, including unbuildable land (Ministry of Ecological Transition).
| Stage | Obligation |
|---|---|
| Listing | Statement: “Les informations sur les risques auxquels ce bien est exposé sont disponibles sur le site Géorisques” (information on the risks to which this property is exposed is available on the Géorisques website) |
| First viewing | Risk report handed over |
| Signing | Annexed to the promesse (preliminary contract) or the deed, dated less than 6 months before |
The seller must also disclose any compensation received for the property following a natural or technological disaster (Ministry of Ecological Transition). Failing this, the buyer may seek cancellation of the sale or a price reduction, with possible damages (service-public.gouv.fr). The details are in our guide on the état des risques (ERP) (risk report).
Checking for yourself on Géorisques and at the town hall
The Géorisques website provides, for each commune, the statement of major risks, the list of natural disaster orders, hazard maps and PPRNs. At the mairie (town hall), you can consult the département’s file on major risks, the DICRIM (municipal information document on major risks) and the prevention plan maps. Since February 2021, the online service Errial has generated a risk report from an address or a plot number; the owner must then check it and complete it with information from the préfecture (Ministry of Ecological Transition, page updated on 22 June 2026).
Since 2003, installing flood markers has been compulsory in communes subject to flooding: they show the height of past floods.
Insurance: natural disasters and limits
Cat nat (natural disaster) compensation requires two conditions (service-public.gouv.fr, checked on 10 April 2026): an insurance contract covering the damaged property, and an arrêté interministériel (interministerial order) recognising the state of natural disaster, published in the Journal officiel (the official gazette).
| Point | Rule |
|---|---|
| Claim to the insurer | No later than 30 days after the order is published |
| Advance payment | Within 2 months of the estimate of damage or the publication of the order |
| Compensation | Within 3 months |
| Statutory excess, home | €380 |
| Excess, drought and soil rehydration | €1,520 |
The cover is funded by an additional premium shown separately on the renewal notice (Insurance Code, art. L125-2). But on land classified as unbuildable by an approved PPR, the insurer is not obliged to provide cover, except for properties that existed before the plan was published. And if the owner fails to carry out within 5 years the measures the PPR imposes on them, the insurer may exceptionally depart from the cover; the bureau central de tarification (central pricing office) may then be asked to intervene (art. L125-6).
Works required by the PPRI: up to 80% funded
Works to reduce vulnerability required by a PPRI are limited to 10% of the market value of a home. The fonds Barnier (Barnier fund, the State’s natural risk prevention fund) finances them at 80%, up to €36,000 per property (Ministry of Ecological Transition, page updated on 1 August 2025). Above 10%, funding remains possible without exceeding €36,000 and 50% of the market value.
Official example. A house valued at €200,000, in a commune with a PPRI that sets requirements: the ceiling is €20,000 (10%). For €5,000 of works (raising floors and electrical circuits), the grant is €4,000 and the amount left to pay €1,000.
The fund always acts in addition to insurance payouts and within the limit of the property’s market value.
FAQ
Can you build on land in a flood zone?
It depends on the PPRI zoning: it distinguishes unbuildable zones, zones buildable subject to specific arrangements and buildable zones (Ministry of Ecological Transition). The zone’s regulations apply to the building permit.
Where can I find out whether an address is in a flood zone?
On Géorisques, which publishes the PPRNs, hazard maps and natural disaster orders for each commune, or at the town hall (Ministry of Ecological Transition).
How long do I have to report flood damage?
No later than 30 days after the natural disaster order is published in the Journal officiel (service-public.gouv.fr).
What is the excess for flood damage?
€380 for a home, under the statutory natural disaster excess (service-public.gouv.fr, checked on 10 April 2026).
Can an insurer refuse a house in an unbuildable zone?
Yes, for a property built after the PPR was published on land classified as unbuildable; earlier properties remain covered by the obligation (Insurance Code, art. L125-6).
Which professional to consult
The notaire (notary) checks that the risk report is annexed to the preliminary contract and is less than 6 months old. The géomètre-expert (chartered surveyor) can locate the plot precisely in relation to the PPRI zoning. The agent immobilier (estate agent) must include the Géorisques statement in the listing. The courtier en crédit (mortgage broker) anticipates the lender’s insurance questions.
Find a professional
One professional per trade and per area, selected and scored out of 100 from public data, with a verifiable title. The trade, its official register and the professionals selected (pages in French):
The notary selected in the largest cities
| City | Professional | Area | Score /100 | Status |
|---|---|---|---|---|
| Paris | Dextera Notaires | Paris, 7e arrondissement | 91 | Selected |
| Marseille | 1391 Notaires | Marseille, 8e arrondissement | 85 | Selected |
| Lyon | Archers Notaires | Lyon, 2e arrondissement | 92 | Selected |
| Montpellier | Lexnot | Montpellier | 93 | Selected |
| Bordeaux | 1645 Notaires | Bordeaux | 90 | Selected |
| Lille | Notaires Lille Royale | Lille | 70 | Selected |
| Rennes | Notaires des Lices | Rennes | 87 | Selected |
| Dijon | Legatis Dijon-Genlis | Dijon | 86 | Selected |
| Brest | Quid Novi Brest Notaires & Conseils | Brest | 86 | Selected |
| Cannes | 1795 | Cannes | 70 | Selected |
The 10 cities with the most sales (DVF 2025) where a notary is selected; in a city with several areas, the best-scoring profile. "Verified": title read at the register by Payotte; "Selected": title declared, verifiable on the profile.
Related guides
Sources
- Ministère de la Transition écologique — Prévention des inondations (mis à jour le 1er octobre 2026) (checked 11 October 2026)
- Ministère de la Transition écologique — Prévention des risques naturels (mis à jour le 22 juin 2026) (checked 11 October 2026)
- Ministère de la Transition écologique — Généralités sur le risque inondation en France (mis à jour le 6 avril 2023) (checked 11 October 2026)
- Ministère de la Transition écologique — Financement de la prévention des risques naturels et hydrauliques (fonds Barnier, mis à jour le 1er août 2025) (checked 11 October 2026)
- Service-public.gouv.fr — Catastrophe naturelle ou technologique : indemnisation par l'assurance (vérifié le 10 avril 2026) (checked 11 October 2026)
- Service-public.gouv.fr — Diagnostic immobilier : état des risques (vérifié le 28 septembre 2026) (checked 11 October 2026)
- Légifrance — Code des assurances, articles L125-1 à L125-6 (lien de service-public.gouv.fr) (checked 11 October 2026)
- Légifrance — Code de l'environnement, articles L562-1 à L562-9 (lien du ministère de la Transition écologique) (checked 11 October 2026)
- Légifrance — Décret n° 2019-715 du 5 juillet 2019 relatif aux plans de prévention des risques concernant les « aléas débordement de cours d'eau et submersion marine » (checked 11 October 2026)
All guides on buying in France · Prices and professionals, city by city