In Paris and in the communes (municipalities) on a list drawn up by the administrative authority, at the request or with the agreement of the municipal council, facades must be “kept constantly in a good state of cleanliness” and undergo ravalement (facade renovation) at least once every ten years, on an injonction du maire (mayor’s order) (article L126-2 of the code de la construction et de l’habitation, Construction and Housing Code). Service-public.gouv.fr cites Paris, Lyon and Nantes among others. The owner, or the syndicat des copropriétaires (owners’ association of a co-owned building), has 6 months after the order to start the works. Failing that, the mayor can prescribe them by an arrêté (municipal order) giving formal notice to carry them out within a deadline the mayor sets, of one year at most (article L126-3). If that deadline is missed, the mayor can have them carried out automatically at the owner’s expense. The fine incurred is €3,750 (article L183-12). Elsewhere, no frequency is imposed.
Which communes are concerned?
Article L126-2 automatically covers Paris, then “the communes appearing on a list drawn up by decision of the administrative authority, on the proposal or after the binding opinion of the municipal councils”. Service-public.gouv.fr presents this list as set by arrêté préfectoral (prefectoral order) and cites Paris, Lyon and Nantes among others.
To find out whether your commune is concerned, service-public.gouv.fr advises asking the town hall’s planning department or checking its website. In communes not covered, “no frequency is laid down” for facade renovation.
Facade renovation means restoring the external walls and the visible elements of the facade: external joinery (windows, shutters, louvred shutters) and ironwork (service-public.gouv.fr). Between two renovations, facades must be kept clean, which may require one-off repairs, cleaning or localised works.
The order procedure, step by step
Facade renovation is not triggered by an anniversary date: it is imposed by the mayor, through a reasoned order that takes into account the condition of the building and how it fits into the urban environment (service-public.gouv.fr). Article L126-3 then sets the timetable:
| Step | Deadline | What happens |
|---|---|---|
| Mayor’s order | Starting point | The owner must start the facade renovation |
| Works not started | 6 months after the order | The mayor may issue an arrêté prescribing them |
| Prescription order | Completion deadline set by the arrêté, 1 year maximum | Formal notice to carry out the works |
| Works started within the 6 months but not finished | 1 year after the order | Same procedure: arrêté and formal notice to finish |
| Formal notice ignored | When the deadline set by the arrêté expires | Works carried out automatically with the authorisation of the president of the court, at the owner’s expense |
When the mayor has the works carried out automatically, the commune advances the costs, then recovers them “as for direct taxes” (article L126-3).
In a co-ownership building
The mayor’s arrêté is validly served on the owners’ association alone, through the syndic (building manager), who must inform each co-owner without delay by registered letter with acknowledgement of receipt (article L126-3). Facade renovation costs are shared among co-owners according to their tantièmes (ownership shares) (service-public.gouv.fr).
Penalties
An owner who has not carried out the works within the deadlines of article L126-3 “is punishable by a fine of €3,750” (article L183-12, in force since 1 July 2021). On top of this comes the risk of works carried out automatically, the cost of which remains payable by the owner.
Planning permission and insulation: two rules not to forget
Prior declaration. A like-for-like facade renovation, without changing colour or materials, is exempt from planning authorisation. However, a déclaration préalable (prior declaration) is required if you change the external appearance, if the building is in a protected area or is a protected building, or if the commune has decided to make facade renovation subject to authorisation (service-public.gouv.fr; articles R*421-17 and R*421-17-1 of the code de l’urbanisme, Planning Code). External wall insulation always requires a prior declaration. In Paris, the application can only be filed online with the Bureau accueil et service à l’usager (Basu, the user reception and service office).
Obligation to insulate. A “major” facade renovation covering at least 50% of the facade, excluding openings, of a heated building requires the renovated walls to be insulated (service-public.gouv.fr, verified 20 June 2025). The obligation covers walls in fired clay, bricks or industrial concrete blocks, poured concrete or metal cladding. It does not apply to facades in stone, raw earth, cob, wood or traditional lime render. An exemption is possible in particular if a document establishes a payback period of more than 10 years. To make external insulation easier, the town hall may allow a projection of 30 cm beyond the siting rules of the PLU (local development plan), and the owner benefits from a right to overhang the neighbouring land by 35 cm at most.
FAQ
Is facade renovation compulsory everywhere in France?
No. The ten-yearly obligation covers Paris and the communes on an administrative list. Elsewhere, no frequency is laid down (service-public.gouv.fr).
Do I have to wait for the mayor to write before renovating?
Yes, for the deadlines: the 6 months to start the works run from the mayor’s order; the completion deadline, one year at most, is then set by the prescription arrêté (article L126-3). Nothing prevents you from acting earlier, but the €3,750 fine presupposes failure to meet these deadlines (article L183-12).
Who pays for facade renovation in a co-ownership building?
The owners’ association commissions the works, and the costs are shared among co-owners according to their tantièmes (service-public.gouv.fr).
Does a like-for-like facade renovation need authorisation?
No, except in a protected area, for a protected building or if the commune has made facade renovation subject to authorisation. Changing the colour or materials requires a prior declaration (service-public.gouv.fr).
Do I have to insulate the facade at the same time?
Yes if the major renovation covers at least 50% of the facade of a heated building and the walls are not made of moisture-sensitive materials, unless an exemption applies (service-public.gouv.fr).
Which professional to consult
Before buying in a building, the notaire (notary) can check whether a facade renovation order or prescription arrêté applies to the facade, and the agent immobilier (estate agent) can send you the latest minutes of the assemblée générale (owners’ general meeting). If external insulation encroaches on a property boundary, the géomètre-expert (chartered surveyor) can establish the exact boundaries with the neighbouring land.
Find a professional
One professional per trade and per area, selected and scored out of 100 from public data, with a verifiable title. The trade, its official register and the professionals selected (pages in French):
The notary selected in the largest cities
| City | Professional | Area | Score /100 | Status |
|---|---|---|---|---|
| Paris | Dextera Notaires | Paris, 7e arrondissement | 91 | Selected |
| Marseille | 1391 Notaires | Marseille, 8e arrondissement | 85 | Selected |
| Lyon | Archers Notaires | Lyon, 2e arrondissement | 92 | Selected |
| Montpellier | Lexnot | Montpellier | 93 | Selected |
| Bordeaux | 1645 Notaires | Bordeaux | 90 | Selected |
| Lille | Notaires Lille Royale | Lille | 70 | Selected |
| Rennes | Notaires des Lices | Rennes | 87 | Selected |
| Dijon | Legatis Dijon-Genlis | Dijon | 86 | Selected |
| Brest | Quid Novi Brest Notaires & Conseils | Brest | 86 | Selected |
| Cannes | 1795 | Cannes | 70 | Selected |
The 10 cities with the most sales (DVF 2025) where a notary is selected; in a city with several areas, the best-scoring profile. "Verified": title read at the register by Payotte; "Selected": title declared, verifiable on the profile.
Related guides
Sources
- Service-public.gouv.fr — Ravalement de façade d'un immeuble : à quelle fréquence doit-il être réalisé ? (vérifié le 6 mars 2026) (checked 11 October 2026)
- Légifrance — Code de la construction et de l'habitation, articles L126-1 à L126-6 (version en vigueur depuis le 1er juillet 2021) (checked 11 October 2026)
- Légifrance — Code de la construction et de l'habitation, article L183-12 (version en vigueur depuis le 1er juillet 2021) (checked 11 October 2026)
- Service-public.gouv.fr — Quelle autorisation d'urbanisme faut-il déposer pour ravaler ou repeindre une façade ? (vérifié le 14 février 2025) (checked 11 October 2026)
- Service-public.gouv.fr — Doit-on obligatoirement entreprendre des travaux d'isolation thermique en cas de rénovation ? (vérifié le 20 juin 2025) (checked 11 October 2026)
All guides on buying in France · Prices and professionals, city by city