In short
If your home is in a Special Flood Hazard Area (SFHA) and your lender is federally regulated, you must carry flood insurance for at least the lesser of your loan balance or the NFIP maximum (42 U.S.C. 4012a). A standard NFIP policy pays up to $250,000 for the building and $100,000 for contents (FEMA). New policies normally start after a 30-day wait (42 U.S.C. 4013).
Who has to buy it?
Congress directs federal lending regulators to bar regulated lenders from making, increasing, extending or renewing a loan secured by a building in an area identified as having special flood hazards, unless flood insurance covers the building and the personal property securing the loan for the term of the loan. The amount must be at least the outstanding principal balance or the maximum available under the National Flood Insurance Program (NFIP), whichever is less (42 U.S.C. 4012a(b)). Lenders must also accept private flood insurance that meets the same requirements.
FEMA summarizes it this way: homes and businesses in high-risk flood areas with mortgages from government-backed lenders are required to have coverage. Fannie Mae requires flood insurance for properties in an SFHA on loans it buys, in an amount equal to the lesser of 100% of the replacement cost of the improvements, the NFIP maximum or the unpaid loan balance. It also caps the flood deductible at the maximum NFIP offers for one- to four-unit homes. All flood zones beginning with “A” or “V” count as SFHAs, and a lender can drop the requirement if FEMA issues a letter saying its maps were amended and the structure is no longer in an SFHA.
If your home is outside an SFHA, no federal law forces you to buy. Flood insurance is still available, and it is often a good idea, because FEMA states that most homeowners insurance does not cover flood damage. See homeowners insurance.
What does NFIP cover?
The NFIP sells a Standard Flood Insurance Policy through FEMA’s NFIP Direct and through private insurers in its Write Your Own program. For a one- to four-family home, the limits are:
| Coverage | Maximum |
|---|---|
| Building | $250,000 |
| Contents | $100,000 |
Source: FEMA; the building figure also appears in 42 U.S.C. 4013(b). If the loan is larger than the NFIP maximum, the lender’s required amount stops at the NFIP maximum (42 U.S.C. 4012a(b)).
How is the premium set under Risk Rating 2.0?
FEMA’s pricing approach, called Risk Rating 2.0, prices each property by its own flood risk instead of by zone and elevation alone. It looks at:
- the likelihood of different types of flood, such as river overflow, storm surge, coastal erosion and heavy rainfall;
- the building: foundation type, first-floor elevation and replacement cost;
- distance to coasts, rivers and lakes;
- flood-proofing features such as flood vents, and levee performance.
New policies became subject to the approach on October 1, 2021, existing policies at renewal on or after April 1, 2022, and FEMA says it was fully implemented on April 1, 2023. By law, rates for most policyholders cannot rise by more than 18% a year until they reach the full risk-based rate.
FEMA does not publish one “average” price for the whole country on these pages. For single-family policies in force on August 31, 2023, 37% cost $0 to $1,000 a year and 32% cost $1,000 to $2,000. Your quote depends on the specific address. Ask for one before you make an offer, because the premium belongs in your monthly budget alongside the escrow account.
What is the 30-day waiting period?
By statute, a new flood policy takes effect 30 days after the application is complete and the first premium is paid (42 U.S.C. 4013(c)(1)). The law makes an exception for the initial purchase made in connection with the making, increasing, extension or renewal of a loan (4013(c)(2)(A)). FEMA’s page puts it plainly: there is “typically” a 30-day waiting period, with exceptions for lender-mandated coverage and for community flood-map changes. Plan the application early so that coverage is in force before you need it.
Where states differ
The NFIP rules above are the same in every state. What differs is where the flood maps place your address, and any rules your state or city adds on top. For states we cover in detail, see Texas natural hazards and insurance and California natural hazards and insurance.
Frequently asked questions
Do I need flood insurance if my lender does not ask for it?
No federal law requires it outside an SFHA. But most homeowners policies do not cover flood, so without a flood policy, flood damage is your own cost.
How long before flood insurance starts?
Normally 30 days after you complete the application and pay (42 U.S.C. 4013). If it is bought in connection with a loan, the statute makes an exception to that wait.
Can I use a private flood policy to meet the lender’s rule?
Yes. 42 U.S.C. 4012a(b) says regulated lenders must accept private flood insurance that meets the coverage requirements. Your lender will check the policy against them.
How much does flood insurance cost?
It depends on the property. FEMA’s data for single-family policies in force on August 31, 2023 show 37% paying up to $1,000 a year and 32% paying $1,000 to $2,000. Get a quote for your address.
Can the flood zone change?
Yes. Fannie Mae’s guide says flood insurance is not required on a structure if the lender obtains a letter from FEMA that its maps were amended and the structure is no longer in an SFHA.
More owning guides
Sources
- 42 U.S.C. 4012a, Flood insurance purchase and compliance requirements (Cornell LII) (consulted October 13, 2026)
- 42 U.S.C. 4013, Coverage terms and effective dates (Cornell LII) (consulted October 13, 2026)
- NFIP's Pricing Approach (FEMA) (consulted October 13, 2026)
- Cost of Flood Insurance for Single-Family Homes under NFIP's Pricing Approach (FEMA) (consulted October 13, 2026)
- Flood Insurance (FEMA) (consulted October 13, 2026)
- Meeting the Flood Insurance Requirement, National Flood Insurance Program brochure (FEMA) (consulted October 13, 2026)
- B7-3-06, Flood Insurance Requirements for All Property Types (Fannie Mae Selling Guide) (consulted October 13, 2026)