In short
In England and Wales, the Party Wall etc. Act 1996 requires you to give your neighbour written notice before you work on a party wall, build on the boundary, or dig near their foundations. The notice period is 2 months for work on an existing party wall and 1 month for a new wall at the boundary or an excavation, and a notice is only valid for a year. Your neighbour has 14 days to consent in writing; silence counts as a dispute, which is settled by one or two surveyors in a party wall award. The person doing the work usually pays all the surveyors’ fees. Either side can appeal an award to the county court within 14 days. The Act does not apply in Scotland or Northern Ireland.
What counts as a party wall
GOV.UK and the explanatory booklet describe three kinds:
- a wall standing on the land of 2 or more owners that forms part of a building;
- a wall standing on the land of 2 owners that is not part of a building, such as a garden wall (but not a timber fence);
- a wall on one owner’s land used by 2 or more owners to separate their buildings.
A party structure is a floor or other structure separating parts of a building in different ownership, as in flats.
Work that needs a notice, and the notice period
| Type of work | Examples | Minimum notice | Example letter in the GOV.UK booklet |
|---|---|---|---|
| Work to an existing party wall or structure (section 2) | Cutting into it, raising or lowering it, removing chimney breasts, demolishing and rebuilding | 2 months | Party structure notice (letter 1) |
| New wall on or at the boundary (section 1) | A new wall astride the line or wholly on your land | 1 month | Line of junction notice (letters 4 and 6) |
| Excavation near a neighbour’s building (section 6) | Within 3 metres and deeper than their foundations, or within 6 metres and cutting a 45° line down from their foundations | 1 month | 3/6 metre notice (letter 8) |
You do not need to notify minor work such as plastering, adding or replacing wiring or sockets, or drilling to put up shelves (GOV.UK). You can start earlier than the notice period only with your neighbour’s written agreement. A party wall agreement is separate from planning permission and building regulations approval: you may need all three.
GOV.UK’s own wording is “between 2 months and a year before you plan to start”. Your neighbours cannot stop work that is within the law, but they can affect how and when it is done.
What your neighbour can do after the notice
- Consent in writing within 14 days. The work can go ahead as agreed.
- Refuse, which starts the dispute procedure.
- Do nothing. For work to an existing wall or an excavation, no written consent within 14 days means a dispute is deemed to have arisen. For a new wall astride the boundary, no consent means you must build it wholly on your own land, at your own expense.
- Serve a counter-notice within one month, asking for extra work for their own benefit, which they pay for. You must answer it within 14 days.
GOV.UK is explicit: you cannot assume that no response means agreement.
When there is a dispute: surveyors and the award
You and your neighbour either agree on one agreed surveyor, or each appoint your own; the two then select a third surveyor, called in only if they cannot agree. You cannot act as your own surveyor. If your neighbour refuses or fails to appoint one, you can appoint a second surveyor on their behalf.
The surveyors produce a party wall award, a legal document setting out what work happens, how and when, and who pays for what, including the surveyors’ fees. Surveyors must act impartially, not as each owner’s representative.
Appeal. Either owner can appeal to the county court within 14 days of the award being served. The booklet warns that an unsuccessful appellant may have costs awarded against them.
Who pays
- The building work: the person who starts it pays, unless the work is needed because of defects or lack of repair, in which case costs are shared by use and responsibility, or the neighbour asked for extra work that benefits them.
- The surveyors: usually the building owner pays all costs of the award, including the neighbour’s surveyor, when the work is solely for their benefit. The surveyors decide.
- How much: the booklet says there are no set charges. Fees are negotiated; you can ask for a breakdown (hourly rate, hours) if you think them unreasonable. In residential cases, an agreed surveyor is “preferable” to keep costs down.
Security. A neighbour worried about work stopping halfway can ask, before it starts, for security such as money, a bond or insurance; the surveyors decide if the owners do not agree.
During the works
You must avoid unnecessary inconvenience, protect the neighbour’s property, and fix or pay for any damage. Your neighbour must let workers and surveyors in during usual working hours, with 14 days’ notice except in an emergency. The Act itself has no enforcement procedure: the booklet points to the civil courts.
Buying or selling a home with party wall work
GOV.UK lists party wall agreements among the papers a seller may need to give a buyer. If you are buying a terraced or semi-detached home where an extension or loft conversion was done, ask your conveyancer whether a notice or award exists.
Which professional to consult
A surveyor can act as a party wall surveyor; the booklet says almost anyone not party to the matter can, but recommends good knowledge of construction and of the Act. A conveyancer checks the paperwork when you buy or sell. For where the boundary itself runs, see property boundaries: party wall surveyors cannot decide a boundary dispute.
Frequently asked questions
Do I need a party wall agreement for a loft conversion or extension?
If the work cuts into or alters a party wall, builds on the boundary, or digs within 3 or 6 metres of a neighbour’s foundations, yes: you must serve notice under the Party Wall etc. Act 1996.
How much notice must I give my neighbour?
2 months for work to an existing party wall, 1 month for a new boundary wall or an excavation. A notice expires after a year.
What if my neighbour does not reply?
For work on an existing wall or an excavation, no written consent within 14 days means a dispute, and surveyors must be appointed. You can appoint one on their behalf if they refuse.
Who pays the party wall surveyor?
Usually the owner doing the work, including the neighbour’s surveyor, when the work is only for their benefit. The surveyors set the split in the award.
Does the Party Wall Act apply in Scotland?
No. The booklet says it applies throughout England and Wales, not in Scotland or Northern Ireland.
General information drawn from the official sources cited and dated on this page. It is not legal, tax or financial advice: for your own situation, ask a licensed professional.
More guides on owning
- Adverse possession: claiming land you have occupied, and defending your title
- Cladding, EWS1 and the Building Safety Act: what leaseholders in England pay
- Council tax bands in England, Scotland and Wales
- Council tax on second homes and empty homes: the premiums by nation
- Divorce, separation and the family home: who keeps it, and the tax (UK)
- Domestic rates in Northern Ireland: how your bill works
- How to challenge your council tax band (and NI domestic rates valuation)
- Inheritance tax on a home: the £500,000 threshold
- Property boundaries: title plans, boundary agreements and disputes
- Property fraud: Property Alert and title restrictions
- Service charges and ground rent on a leasehold home
- Transfer of equity: adding or removing a name on a property title (England and Wales)
Sources
- Party walls and building work (GOV.UK) (consulted 21 October 2026)
- The Party Wall etc. Act 1996: explanatory booklet (GOV.UK) (consulted 21 October 2026)
- Preventing and resolving disputes in relation to party walls: example letters (GOV.UK) (consulted 21 October 2026)